Page 1 :
UNIT -3 WORK STUDY, , WORK STUDY, , Work study is the study of human work in all aspects to increase the effectiveness with which the work, o, , ts done., , Work Study = Method Study + Time Study, , METHOD STUDY, Method study is the systematic recording and critical examination of present and proposed ways of, , doing work. It is used to improve work efficiency, , TIME STUDY, Time study or work measurement is the technique t establish the time for a qualified worker to, , carryouta specific job at a definite level of performance.
Page 2 :
WORK STDUY, To improve product quality, To improve safety, , To reduce wastages, , To reduce work content fo, , oduct, , , , , , , , To develop effective work, , method, , , , blish standard:, , , , nce, , , , To effectively use the plant,, equipment, man power and, Material, , , , OBJECTIVES OR PURPOSE, METHODSTUDY, , To improve work place layout, , To improve material handling, , To improve maintenance, , To improve process and, procedure, , To reduce w, , To reduce wastage of labour, , TIMESTUDY, To improve planning and control, , To set standard time for job, , To reduce production cost, , , , To compare alternative methods, , To avoid wey te ype
Page 3 :
CONCEPT OF WORK CONTENT, , , , © Itis defined as thi mount of work which has to be done ina given time to complete the job, , ® generally it ts measured in terms of man hours and machine hours., + Work content has two components. They are,, a. Basic work content, , b. Excess work content, , Basic Work Content, , ® This is the minimum time required theoretically to do the job., , This can not be reduced, , @ The basic work content is the work contained ina job in the following bdeal conditions., a. The design of product ts perfect., , b. Planned manufacturing process is followed without any deviation., , © There is no loss of working time., , d. But the above idle condition is not possible in nature.
Page 4 :
1, Inefficient manufacturing methods, , ss Work Conte, Excess Work Content a) Improper selection of manufacturing process, , ) mplete agive:, + Onecan notcomplete a given job within sud lainhdan, , the basic work content time a) Improper selection of tools, , @ There must be a excess time to complete b) Improper layout of plantand work place, , the job, ¢) Wrong material handling, , © In production work, the excess work 4) No standardization, , content gets added to the basic work 3. Inefficient management, content due to following a) Poor production planningand control, 1, Defective design and Specification b) Poor safety measures, of the product ¢) Improper communication, a) Bad design of product d) Bad working conditions, b) Not in standardization of 4. Effectiveness workers, components a) Frequent absentecism, ¢) Incorrect quality b) Low performance, standards ¢) Carelessness, , d) Wastage of time
Page 5 :
TECHNIQUES TO REDUCE WORK CONTENT, By the prod, 1, By the product 4, L Good design /, iL Marketanalysis, , iii, Val, , , , ue analysis *, iv. Standardization, 2. Reduce ineffective time by work, i. Properplanning, iL Method study, 3. Reduce ineflective time by, management, i. Productsimplification, iL Good inventory control, iii, Proper plant maintenance, iv. Better working condition, , ¥, Standardization, , Reduce, , ineffective time by workers, , , , Proper Training, Good safety measures, Good Incentive schemes, , Good personal policies