Question 1 :
Creep in excess of __mm should be adjusted before the work of lubrication of rail joints is undertaken .*
Question 3 :
Competency certificate to welding operators for flush butt welding shall be granted by .*
Question 4 :
SWR on PSC sleepers shall not be laid on curves sharper than ____ metre radius . *
Question 5 :
In case of Short Welded Rails , the gap survey & adjustment should normally be done before the end of month of . *
Question 6 :
The top of the creep indicator post should be about ____ the rail level and the amount of creep one way or the other measured with a fishing cord stretched over the chisel marks . *
Question 8 :
During Emergency repairs to buckled track in LWR/CWR, The buckled rails shall preferably be gas cut adequately apart not less than ____m .*
Question 9 :
What should be the anticipated residual life in years of rail of SWR track to qualify for conversion into LWR .*
Question 10 :
Regular track maintenance operations in SWR may be carried out without restriction when the rail temperature is below ____ in the case of zone I & II and _____ in the zone III and IV . *
Question 11 :
on curves of less than 875 metre radius in BG or yielding formation Regular track maintenance operations in SWR may be carried out without restriction when the rail temperature is below ____ in the case of zone I & II and _____ in the zone III and IV .*
Question 12 :
If the maintenance operations have to be undertaken in SWR at temperature higher than specified, not more than ___ sleeper spaces in one continuous stretch shall be opened, leaving at least ____ fully boxed sleeper spaces between adjacent lengths . *
Question 13 :
In Case of SWR track on BG route, In case of fracture in the weld or in the rail, minimum portion of rail with fracture is cut and replaced is _____m . *
Question 14 :
SWR track no weld lies closer than ___ m from the fish- plated joint .*
Question 15 :
The minimum length of permanent rail closure required for locations such as 500m of both side approaches of tunnels, tunnel proper, major and important bridges including bridge proper, deep cuttings and high embankments is .*
Question 16 :
Closures should be separated by at least ____ m on the same rail (left or right rail) and ____m on opposite rails .*
Question 17 :
A length of welded rail greater than ___ m on Broad Gauge will normally function as LWR .*
Question 18 :
LWR/CWR will not be laid on curve sharper than in rail Temperature zone -I . *
Question 19 :
LWR/CWR shall not be laid on curves sharper than ______ m radius . *
Question 20 :
Destressing temperature for 60 kg. rail in zone IV whose Tm is 37 Deg.is ____ Deg . *
Question 21 :
The minimum track structure on the running loops should be ___ Kg/m rails laid as _____Panels, sleeper density ____ Nos.per km and ____mm clean ballast cushion .*
Question 22 :
Extra shoulder width of ballast on curve in double line for LWR is .*
Question 23 :
In case of SWR, ____ mm extra width of shoulder ballast over and above the standard ballast section on tangent track shall be provided on outside of curves upto 875 metre radius . *
Question 24 :
The width of ballast shoulder to be provided on the outside of the curve in case of LWR is provided on the reverse curve .*
Question 25 :
In temperature Zone-I, if LWR/CWR laid on curves of 350 m radius then reference marks should be provided at every ____m interval to record creep .*
Question 26 :
In temperature Zone-I, if LWR/CWR laid on curves of 350 m radius then SEJ should be located in straight track at ____ m away from the tangent point .*
Question 27 :
Wherever on reverse curves neither straight can be eliminated nor a straight of minimum 50 meters can be provided on B.G Permissible speed should not exceed . *
Question 28 :
LWR/CWR cannot be laid on reverse curve having radius sharper than .*
Question 29 :
If one LH curve is followed by a RH curve , the two curves will be called as .*
Question 30 :
The steepest permitted grade for LWR/CWR shall be ______ to .*
Question 31 :
The conventional SEJ (RT-4160 and RT-4165) with straight tongue and stock shall not be located on curves sharper than ____ m radius .*
Question 32 :
The improved SEJs (RT-6902, RT-6914, RT-6922, RT-6930) may be located on curves up to ___°. SEJ up to ___° shall be laid with approval of PCE in consultation with RDSO .*
Question 33 :
Improved SEJ can be used for how many maximum degree of curve with approval of PCE in consultation with RDSO .*
Question 34 :
During gap measurement at SEJ, for improved SEJ with double gap of max. 65 mm each i.e. DG 65 design the distance shall be measured between ________ the movement of which is being recorded : *
1/1
Question 35 :
The SEJ shall not be located on ____ of curves .*
Question 36 :
LWR/CWR can be continued over bridges without any calculations and extra provisions on _____ . *
Question 37 :
Detailed calculations shall be done by the Design office of Chief Bridge Engineer / CAO(C) to ascertain the effect of LWR of such bridges and its effect on the Sub-structure of the bridge as per Para 2.8.1.2 of “Bridge Rules”. If LWR/CWR continue on___.*
Question 38 :
Maximum length of single span of bridge on that LWR/CWR shall be continued over bridges provided with rail-free fastenings and partly box-anchored and PRC sleepers on approaches .*
Question 39 :
If LWR/CWR continue on unballasted bridges with provision of Rail-free fastenings, partly box-anchored and PRC sleepers on approaches then, Central sleepers shall be anchored with anchoring arrange. (____each in end spans and ___ each in the middle spans) .*
Question 40 :
If LWR/CWR continue on unballasted bridges with provision of rail free fastenings and box anchoring then bearing of bridge shall be inspected during the months of ______ each year and cleared of all foreign materials . *
Question 41 :
Maximum overall length of unballasted bridge on that LWR/CWR shall be continued over bridges provided with rail-free fastenings in overall length of the bridge and PRC sleepers on approaches without provision of SEJ .*
Question 42 :
Maximum length of bridge that can be provided with welded rails over a single span bridge with rail free fastenings and SEJs with 190 mm gap away from abutment .*
Question 43 :
Welded rails may be provided from pier to pier with rail-free fastenings and with SEJ on each pier then the rail shall be box-anchored on ___ sleepers .*
Question 44 :
LWR/CWR may also be continued over a bridge with the provision of SEJ at the far end approach of the bridge using rail-free fastenings over the girder bridge in this case far end SEJ to be installed at a minimum ___m distance from abutment .*
Question 45 :
The maximum length of the bridges with the far end SEJ arrangement that can be permitted in various rail temperature zones for LWR/CWR with SEJs having maximum movement of 120 mm .*
Question 46 :
Welded rails may be provided over a single span bridge with rail free fastenings and SEJs with 190 mm gap at ____m away from both abutments .*
Question 47 :
Maximum length of bridge that can be provided with welded rails over a single span bridge with rail free fastenings and SEJs with 190 mm gap away from abutment .*
Question 48 :
The existing SSE/P.Way (In-charge) shall record rail temperature using preferably a well-calibrated _____ thermometer and data to be updated in TMS .*
Question 49 :
Dial type thermometer takes ____minutes for attaining temperature of the rail .*
Question 50 :
The maximum and minimum rail temperature for a continuous period of at least ___years shall be ascertained and the mean rail temperature (tm) for the region arrived at . *
Question 51 :
Of the various types of thermometers, the most reliable and quick device .*
Question 52 :
Continuous recording type rail thermometer consists of a graduated chart mounted on a disc, which gets rotated by a winding mechanism at a constant speed to complete one revolution in .*
Question 53 :
The thermal force (P) in LWR calculated by P = ____, Here, P = Thermal force in the rail (kg), E= Mod. of elast. of rail steel, A = Area of c/s of the rail (cm2)α = Co. of linear exp. of steel, t = Var. of rail temp . *
Question 57 :
Distressing temperature for should be within temperature range for Temperature zone III for 52 kg rail section .*
Question 58 :
Distressing temperature for should be within temperature range for Temperature zone IV for 52 kg/m rail section and heavier .*
Question 59 :
LWR plans may be prepared to a horizontal scale of .*
Question 60 :
All weld collars in areas prone to corrosion should be painted with the frequency of .*
Question 61 :
All weld collars in areas prone to severe corrosion should be painted with the frequency of .*
Question 63 :
In case, LWR is terminated near Points & Crossings, one three rail panel (39 m) shall be provided between _____ .*
Question 64 :
All insulations for track circuiting in LWR/CWR shall be done by providing glued joints of ____ type .*
Question 65 :
During laying of LWR, Rails shall normally be welded into sufficiently long panels of ____ rail lengths or more by flash butt welding, either in the welding depot or on cess or in-situ .*
Question 66 :
During laying of LWR, After welding into sufficiently long panels of about ___ km or longer, destressing shall be undertaken as soon as possible .*
Question 67 :
Consolidation of track can be achieved by the for Existing track where maintenance activity involving disturbance to ballast compaction has been undertaken .*
Question 68 :
Consolidation of track can be achieved by the for Existing track where maintenance activity involving disturbance to ballast compaction has been undertaken .*
Question 69 :
Consolidation of track can be achieved by For newly laid track (CTR/TSR) or freshly deep screened Track .*
Question 70 :
Longitudinal ballast resistance for the PRC sleepers for density 1660 sleepers/km is kg/Cm/Rail .*
Question 72 :
73."Gaps at SEJ shall be adjusted at the time of de-stressing of LWR/ CWR for 52 kg/m rail section is Temporary destressing is valid for how many days.*
Question 73 :
In LWR, Minimum breathing lengths on PSC sleepers for different temperature zones and sleeper density as given in IRPWM .*
Question 74 :
In LWR track in case of Derailments, after all the damaged sleepers are replaced, the affected portion and _____ metres on either side should be de-stressed after consolidation, and normal speed should be restored thereafter .*
Question 75 :
While carrying out destressing of LWRs without Rail Tensors , before traffic block fastenings on alternate sleepers may be loosened after imposition of speed restriction of .*
Question 76 :
If rail temperature after regular track maintenance in LWR track exceeds td+20 0C during the period of consolidation , the speed restriction which should be imposed is .*
Question 78 :
During destressing of rail with tensor, During traffic block, cut the rail at the paint mark, insert a rail closure of length exactly equal to X metre and weld one end thereof, Here X = .*
Question 79 :
During destressing with rail tensor, Release the tensor after a lapse of a minimum of ____minutes after pouring of the weld metal .*
Question 80 :
During manual destressing of LWR, Fastenings for ___ m on each end of the LWR shall be removed before welding .*
Question 81 :
When followed by SWR track the ballast section & cushion provided for LWR/CWR shall be continued upto .*
Question 83 :
For changing LWR into CWR the value use l + Lα(t0-tp) +Y0 + Y'0 + 2 x 25 -1, Here L is equal to .*
Question 84 :
While marking reference line on reference post after initial laying of SEJ the reference line must coincide with.*
Question 85 :
The regular track maintenance in LWR/CWR shall be confined to hours when the rail temperature is between _____ and shall be completed well before onset of summer .*
Question 86 :
In LWR, Shortage of ballast in the shoulder at isolated places shall be made up by the Gangmate by taking out minimum quantity of ballast from the centre of the track between the two rails over a width not exceeding __ mm and a depth not exceeding ___ mm .*
Question 87 :
Tamping in LWR/CWR with general lift not exceeding ____mm including correction of alignment shall be carried out during the period when prevailing rail temperatures are as specified together with precautions laid down .*
Question 88 :
If Manual maintenance of LWR taken with opening of 30 sleepers space in a conti. stretch at two places then Maintenance of in between lengths shall not be undertaken till passage of traffic for at least 24 hours in case of ____ or 2 days in case of ______.*
Question 89 :
If the maintenance operations have to be undertaken in SWR at temperature higher than specified, not more than _____ sleeper spaces in one continuous stretch shall be opened, leaving at least ___________ fully boxed sleeper spaces between adjacent lengths .*
Question 90 :
During manual maintenance of LWR, In exceptional circumstances for any specific work during the period when minimum daily rail temperature is within maintenance range upto _______ sleeper spaces may be opened under the direct supervision of JE/SSE/P.Way .*
Question 91 :
During Casual renewal of sleepers in LWR, Not more than one sleeper in ____ consecutive sleepers shall be replaced at a time .*
Question 92 :
In LWR, In case fastenings of more than one sleepers are required to be renewed at a time without lifting, then at least ___ sleepers in between shall be kept intact. Work shall be done under supervision of_______ .*
Question 93 :
In LWR, In case fastenings of more than one sleepers are required to be renewed at a time with lifting, then at least ___ sleepers in between shall be kept intact. Work shall be done under supervision of__________.*
Question 94 :
In LWR, if prevailing rail temperature is lower than td-10, fastening up to____ sleepers on either side may be removed for replacement of rubber pad under the rail .*
Question 95 :
Once in a ____ SEJs shall be checked, packed and aligned if necessary. Oiling and greasing of tongue and stock rails of SEJ and tightening of fastenings shall be done simultaneously .*
Question 96 :
Whenever it is decided to carry out through renewal of fittings, the LWR shall be destressed immediately after the TFR is completed of _______ .*
Question 98 :
If range of rail temperature falls within _____, deep screening may be done without cutting or temporary de-stressing .*
Question 100 :
Dial type thermometer takes ____minutes for attaining temperature of the rail .*
Question 102 :
What is the age limit for filling up vacancies for PHP among SC .*
Question 103 :
What is the relaxation of age limit for direct recruitment for OBC candidates .*
Question 104 :
Who is the appointing authority for Group 'D' in Level-1 (GP 1800). .*
Question 105 :
What is the % of Direct Recruitment of PWI Level-6 .*
Question 106 :
Who is competent to reappoint an employee who has resigned from services .*
Question 107 :
What is the % filled up in initial grade level 1 on transfer of Gangman, Khalasi and Safaiwala in Workshop .*
Question 108 :
What is the maximum age limit for general candidate appointment in class IV .*